SixLeanSigma.com
  • Home
  • Six Sigma Wiki
    • History of Six Sigma : The Guru’s
    • Lean vs Six Sigma
    • What is Six Sigma ? Objectives Fundamental Beliefs Benefits
    • Six Sigma Project Overview >
      • Six Sigma Process Performance Metrics
      • Project Execution : Selection , Flowchart , Management , Evaluation
      • Voice of the Customer (VOC) >
        • CTX (Critical to X) Quality
        • Kano Model
        • Different type of Quality Cost
      • Risk Analysis SWOT (Strength, Weakness, Opportunity, Threat)
    • Six Sigma Team Management : Types, Roles, Size, Stages & Life cycle >
      • Six Sigma Organizational Infrastructure Team Leadership >
        • Six Sigma Roles and owners process
        • 3 levels of business management process
        • Six Sigma Training: Black vs Green Belt
        • Overview of DMAIC : Key points
      • Six Sigma Team Tool: Facilitation & Groupthink
      • Nominal Group Techniques Multivoting Force Field Analysis Brainstorming
      • Diagrams : Affinity Tree PDPC Matrix Interrelationship Prioritization matrices Activity network diagram
      • The 4 Stages of Team Growth & Human factor: Forming, Storming, Norming, and Performing
    • Six Sigma: Define Phase : Outcomes & 6 Element >
      • Six Sigma Define: 1Define Problem & 2 Identify Customer
      • Six Sigma : Define : 3 : Identify CTQs ( VOC Kano Model )
      • Six Sigma : Define : 4 : Map Process 5 Refine Project Scope
      • Six Sigma : Define : 6 Update Project Charter ( PERT CPM Gantt Bar WBS)
    • Six Sigma: Measure Phase : Outcomes & 5 Element >
      • Six Sigma: Measure : 1 Identify Measurement and Variation
      • Six Sigma: Measure : 2 Determine Data Type
      • Six Sigma: Measure : 3 Develop Data Collection Plan
      • Six Sigma: Measure : 4 Measurement System Analysis & Data Collection
      • Six Sigma: Measure : 5 Perform Capability Analysis
    • Six Sigma: Analyze Phase : Outcomes & 4 Element >
      • Six Sigma Analyze : 1 Measuring and modeling the relationship between Variables
      • Six Sigma Analyze : 2 Hypothesis Testing
      • Six Sigma Analyze : 3 Failure mode and effects analysis (FMEA)
      • Six Sigma Analyze : 4 Analysis of Variance (ANOVA)
    • Six Sigma: Improve Phase : Overview & 6 Element >
      • Six Sigma: Improve Phase : 1 About Design of experiments (DOE)
      • Six Sigma: Improve Phase : 2 DOE Process variables & Analysis
      • Six Sigma: Improve Phase : 3 Design Selection Guideline
      • Six Sigma: Improve Phase : 4 : Lean 5S
      • Six Sigma: Improve Phase : 5 Poke Yoke
      • Six Sigma: Improve Phase : 6 Standard Work & Kaizen
    • Six Sigma: Control Phase : Overview & 3 Element >
      • Six Sigma: Control Phase : 1. Statistical Process Control
      • Six Sigma: Control Phase : 2. Control Chart
      • Six Sigma: Control Phase : 3. Other: Pre-control Technique, TPM & Visual Management
  • Lean Wiki
    • History of Lean & Guru’s >
      • Birth of Lean
    • About Lean, Value, Waste, Muda, Mura & Muri >
      • Overview Lean Tools, Techniques & House of Lean
      • Lean Excellence, Tools & Framework
      • Lean Framework 6 points, metric & Stability
    • Lean Team Setup : Structure, Meeting & Project >
      • Self Directed Work Teams (SDWT) , ACHIEVE TEAM SYNERGY , SQDCM, Teamwork Principles, Team Structure & Team Leader
      • The 4 Stages of Team Growth & Human factor: Forming, Storming, Norming, and Performing
    • Lean Process Mapping: Generic & Type >
      • SIPOC: Suppliers, Input, Process, Output & Customers
      • Lean Process Management , Excellence , Identification , Design & Mapping
      • Lean Process Mapping Symbols
      • How to Create a Simple Process Flow Diagram
      • Lean Value Stream Mapping, current, future & 3 type of work
      • Value Stream Mapping (VSM): About & 17 steps
      • Other Types of Process Maps & Pitfalls: Resources: iDef0, Document Map, Work Diagrams, Rendered Process Map
    • Lean Process Optimization , Andon System , Error Proofing ( Poka Yoke ) & Defect vs Errors >
      • Lean 5S System
      • Kanban : Benefits, Shapes of Inventory, Type, Operation & Sizing
      • Cellular Manufacturing: About, Benefits & 4 Dimensions of Cells
      • Heijunka, A 3 Thinking, Hoshin planning, Jidoka, Poka‐yoke , Kanban, Takt , Kaizen
      • Lean Kaizen (continuous improvement), Systems Thinking & Process Variability
      • Lean Visual Management & Visual Control
      • Lean Waste Detail: Eight Types of Waste
      • Line Balancing, Cycle Time, Takt Time, Assembly / Workload Balance & Man – Machine – Setup – Time
      • Single Piece Flow, Continuous Flow & Standardized Work
      • SMED Single Minute Exchange of Dies
      • Total Productive Maintenance (TPM): Preventive Maintenance Corrective Maintenance Inbuilt Maintenance
  • Blog
  • Contact

Is your company Six Sigma ? 5 Sigma? 4 Sigma ? Confuse, what is 5 & 4 Sigma?

7/10/2021

0 Comments

 
Picture
Everyone talk about Six Sigma. It’s okie, we get it, Six Sigma is the highest quality standard or in short, 3.4 defect in million.
Truth is, it’s not easy to achieve six sigma, it’s a long process which will take continuous effort like employee training, skill, mindset, champion, leader etc.. In meantime, you can evaluate your company based on different six sigma levels which may surprise you as this level are hardly discussed on Web. So here are:
5 Sigma , 4 Sigma , 3 Sigma , 2 Sigma and yeah 1 Sigma. Really? Answer is Yes.
Whatever your company, group, business, non-profit , education etc. is delivering to end user, based on metric or say number you can still give credit to your entity. You can understand different level of sigma from below definition:
Say, you sold 1 million product, out which 3.4 product are defect, then you can say my process is Six Sigma or other words, my company operate at six sigma level.  If, it’s 230 defect in million then your company is at 5 Sigma level. Same goes for 4 Sigma as 6200 defect in million, 3 Sigma as 67,000 defect in million, 2 sigma as  310,000 defect in million &   1 Sigma as 700,000 defect in Million.
BE PROUD OF YOUR ORGANIZATION, AWARD THEM TODAY WITH AT LEAST ONE OF SIGMA LEVEL. First step, is motivation, it can bring a drastic change. Talk to your quality department or customer department, ask specific questions like:
1. Number of product sold this year?
2. Number of return or defect by end user or your customer?
Divide – Number of return or defect / Number of Product Sold
Then multiply above output with million, will give you answer where your company stand.
More on Metrics & calculation read here:

0 Comments



Leave a Reply.

    Author

    My name is Bharat. I have 10+ years experience working with Fortune 500 companies. 

    Archives

    July 2021

    Categories

    All

    RSS Feed

All content reserved by SixLeanSigma.com​.  
  • Home
  • Six Sigma Wiki
    • History of Six Sigma : The Guru’s
    • Lean vs Six Sigma
    • What is Six Sigma ? Objectives Fundamental Beliefs Benefits
    • Six Sigma Project Overview >
      • Six Sigma Process Performance Metrics
      • Project Execution : Selection , Flowchart , Management , Evaluation
      • Voice of the Customer (VOC) >
        • CTX (Critical to X) Quality
        • Kano Model
        • Different type of Quality Cost
      • Risk Analysis SWOT (Strength, Weakness, Opportunity, Threat)
    • Six Sigma Team Management : Types, Roles, Size, Stages & Life cycle >
      • Six Sigma Organizational Infrastructure Team Leadership >
        • Six Sigma Roles and owners process
        • 3 levels of business management process
        • Six Sigma Training: Black vs Green Belt
        • Overview of DMAIC : Key points
      • Six Sigma Team Tool: Facilitation & Groupthink
      • Nominal Group Techniques Multivoting Force Field Analysis Brainstorming
      • Diagrams : Affinity Tree PDPC Matrix Interrelationship Prioritization matrices Activity network diagram
      • The 4 Stages of Team Growth & Human factor: Forming, Storming, Norming, and Performing
    • Six Sigma: Define Phase : Outcomes & 6 Element >
      • Six Sigma Define: 1Define Problem & 2 Identify Customer
      • Six Sigma : Define : 3 : Identify CTQs ( VOC Kano Model )
      • Six Sigma : Define : 4 : Map Process 5 Refine Project Scope
      • Six Sigma : Define : 6 Update Project Charter ( PERT CPM Gantt Bar WBS)
    • Six Sigma: Measure Phase : Outcomes & 5 Element >
      • Six Sigma: Measure : 1 Identify Measurement and Variation
      • Six Sigma: Measure : 2 Determine Data Type
      • Six Sigma: Measure : 3 Develop Data Collection Plan
      • Six Sigma: Measure : 4 Measurement System Analysis & Data Collection
      • Six Sigma: Measure : 5 Perform Capability Analysis
    • Six Sigma: Analyze Phase : Outcomes & 4 Element >
      • Six Sigma Analyze : 1 Measuring and modeling the relationship between Variables
      • Six Sigma Analyze : 2 Hypothesis Testing
      • Six Sigma Analyze : 3 Failure mode and effects analysis (FMEA)
      • Six Sigma Analyze : 4 Analysis of Variance (ANOVA)
    • Six Sigma: Improve Phase : Overview & 6 Element >
      • Six Sigma: Improve Phase : 1 About Design of experiments (DOE)
      • Six Sigma: Improve Phase : 2 DOE Process variables & Analysis
      • Six Sigma: Improve Phase : 3 Design Selection Guideline
      • Six Sigma: Improve Phase : 4 : Lean 5S
      • Six Sigma: Improve Phase : 5 Poke Yoke
      • Six Sigma: Improve Phase : 6 Standard Work & Kaizen
    • Six Sigma: Control Phase : Overview & 3 Element >
      • Six Sigma: Control Phase : 1. Statistical Process Control
      • Six Sigma: Control Phase : 2. Control Chart
      • Six Sigma: Control Phase : 3. Other: Pre-control Technique, TPM & Visual Management
  • Lean Wiki
    • History of Lean & Guru’s >
      • Birth of Lean
    • About Lean, Value, Waste, Muda, Mura & Muri >
      • Overview Lean Tools, Techniques & House of Lean
      • Lean Excellence, Tools & Framework
      • Lean Framework 6 points, metric & Stability
    • Lean Team Setup : Structure, Meeting & Project >
      • Self Directed Work Teams (SDWT) , ACHIEVE TEAM SYNERGY , SQDCM, Teamwork Principles, Team Structure & Team Leader
      • The 4 Stages of Team Growth & Human factor: Forming, Storming, Norming, and Performing
    • Lean Process Mapping: Generic & Type >
      • SIPOC: Suppliers, Input, Process, Output & Customers
      • Lean Process Management , Excellence , Identification , Design & Mapping
      • Lean Process Mapping Symbols
      • How to Create a Simple Process Flow Diagram
      • Lean Value Stream Mapping, current, future & 3 type of work
      • Value Stream Mapping (VSM): About & 17 steps
      • Other Types of Process Maps & Pitfalls: Resources: iDef0, Document Map, Work Diagrams, Rendered Process Map
    • Lean Process Optimization , Andon System , Error Proofing ( Poka Yoke ) & Defect vs Errors >
      • Lean 5S System
      • Kanban : Benefits, Shapes of Inventory, Type, Operation & Sizing
      • Cellular Manufacturing: About, Benefits & 4 Dimensions of Cells
      • Heijunka, A 3 Thinking, Hoshin planning, Jidoka, Poka‐yoke , Kanban, Takt , Kaizen
      • Lean Kaizen (continuous improvement), Systems Thinking & Process Variability
      • Lean Visual Management & Visual Control
      • Lean Waste Detail: Eight Types of Waste
      • Line Balancing, Cycle Time, Takt Time, Assembly / Workload Balance & Man – Machine – Setup – Time
      • Single Piece Flow, Continuous Flow & Standardized Work
      • SMED Single Minute Exchange of Dies
      • Total Productive Maintenance (TPM): Preventive Maintenance Corrective Maintenance Inbuilt Maintenance
  • Blog
  • Contact